Tuusula church village campus, Tuusula
- A total of 560 meters of A-BEAM® composite beams were delivered to the site.
- In addition to the composite beams, the delivery included approximately 50 AOK® brackets as well as AEP® hidden brackets.
- The site will be completed in the summer of 2024